Commit Graph
3 Commits
Author SHA1 Message Date
arkonandClaude Opus 4.6 090fc71fd0 docs: fix inaccurate Phase 2 and Phase 7 status in code-structure-findings.md
Phase 2: respawn-controller.ts and ralph-tracker.ts were never migrated
to CleanupManager/Debouncer despite being marked complete. Corrected
status to reflect actual codebase state (6 of 8 files migrated).

Phase 7: All 12 route test files now exist, updated from "9 remaining".

Scorecard adjusted: Resource Cleanup 9→8/10, Test Coverage 7→7.5/10.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-01 15:36:15 +01:00
arkonandClaude Opus 4.6 df551b5356 docs: mark all 7 phases complete in code-structure-findings.md
Update scorecard with before/after scores, mark phases 3-7 as
complete with verified line counts and file inventories. Fix 3
CLAUDE.md inaccuracies: static cache 1h→1y, route count ~160→~113,
remove stale src/tui reference.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-01 14:50:17 +01:00
arkonandClaude Opus 4.6 e0a2774d37 perf: implement phase 1-3 performance optimizations
Add implementation plans and code structure analysis for a 3-phase
performance optimization effort. Refactor core modules to reduce
timer overhead, consolidate regex usage, extract exec timeout config,
add debouncer utility, and streamline server/schema validation.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-28 17:39:44 +01:00